To go to Guadalajara, is the libramiento road work finished or is it still tar and gravel conditions?
sm1mex- Share Holder
- Posts : 1695
Join date : 2012-06-27
Re: Libramiento-Still under construction or is construction finished?
It didn't have any crap on it yesterday.
Re: Libramiento-Still under construction or is construction finished?
Only three people working on the North side of the road near the fire station. With one flagman slowing traffic slightly at that point this afternoon. The road looked pretty good, better than before.
MexicoPete- Share Holder
- Posts : 2275
Join date : 2012-04-21
Age : 105
Location : Ajijic, Seattle, & Vancouver Island
Re: Libramiento-Still under construction or is construction finished?
Ok, I'll go for it. thanks.
sm1mex- Share Holder
- Posts : 1695
Join date : 2012-06-27
Re: Libramiento-Still under construction or is construction finished?
Its fine just look out for the gravel on the edges of the road or where other roads join main road. Use common sense.
Zedinmexico- Share Holder
- Posts : 5604
Join date : 2011-10-28
Location : On the hill in Ajijic
Humor : Red Dwarf, Marx Brothers, SCTV
sm1mex- Share Holder
- Posts : 1695
Join date : 2012-06-27
Re: Libramiento-Still under construction or is construction finished?
That they are leaving a two inch tire grabbing ridge on both sides of the road seems like maybe they are taking a vacation before finishing the job....I hope.
caramela del mar- Newbie
- Posts : 15
Join date : 2014-02-12
Humor : hicks, carlin
Similar topics
» Is the road construction finished?
» Macro Libramiento (Libramiento del Sur)
» Movie is almost finished...
» problems on libramiento
» Las Palmas -- Libramiento
» Macro Libramiento (Libramiento del Sur)
» Movie is almost finished...
» problems on libramiento
» Las Palmas -- Libramiento
Permissions in this forum:
You cannot reply to topics in this forum