INSIDE LAKESIDE
Log In or Register

Check your spam/junk folder for activation e-mail after you register.

Join the forum, it's quick and easy

INSIDE LAKESIDE
Log In or Register

Check your spam/junk folder for activation e-mail after you register.
INSIDE LAKESIDE
Would you like to react to this message? Create an account in a few clicks or log in to continue.

ROOF PAINTING TIME

+5
johninajijic
ComputerGuy
Zedinmexico
CheenaGringo
gringal
9 posters

Page 2 of 2 Previous  1, 2

Go down

ROOF PAINTING TIME - Page 2 Empty Re: ROOF PAINTING TIME

Post by ferret Wed May 02, 2012 9:54 pm

The white definitely does keep the house cooler. The roof on the house we are renting in Riviera Alta just was done in February. It was terracotta before and now is white. Today was the first day I put the fan in the bedroom on low.
John's information about Fester is, IMHO, bang on. When we re-did the roof of our house in San Pancho (five years after construction), we used 10 year Fester Acriton and a membrane and John's instructions. The contractor we used said he had never seen a thicker or better impermabilizante...icky stuff to work with but more than does the job.

ferret
Share Holder
Share Holder

Posts : 10353
Join date : 2010-05-23

Back to top Go down

ROOF PAINTING TIME - Page 2 Empty Re: ROOF PAINTING TIME

Post by ferret Wed May 02, 2012 10:07 pm

Sparks...it's not just the sealing of the tile. The tiles come in various costs per tile. You want a tile that is smooth on both the top and below...in 2005 that was a difference of 2 pesos per tile...30 tiles to a square metre.
A peaked roof has the advantage of having the sun on only half of it for half the day. Actual real clay tile roofs are cooler than cement only with a white coating roofs.
Gringal, friends of ours in San Pancho had a flat roof and low ceiling height. It was very hot in the house. They built a frame about 1/2 metre high and, leaving an air pocket about 1 foot high, covered it with palm fronds...instant and prolonged relief from the heat.
ferret
ferret
Share Holder
Share Holder

Posts : 10353
Join date : 2010-05-23

Back to top Go down

ROOF PAINTING TIME - Page 2 Empty Re: ROOF PAINTING TIME

Post by gringal Wed May 02, 2012 11:23 pm

Ferret: Sounds very logical. Meanwhile..............gasp. But at least the hot months are short.

gringal
Share Holder
Share Holder

Posts : 11955
Join date : 2010-04-09
Location : Lake Chapala (from CA)
Humor : occasionally

Back to top Go down

ROOF PAINTING TIME - Page 2 Empty Re: ROOF PAINTING TIME

Post by johninajijic Thu May 03, 2012 10:10 am

gringal wrote:Ferret: Sounds very logical. Meanwhile..............gasp. But at least the hot months are short.

Still close to THE BEST weather in the world and low cost of living.
johninajijic
johninajijic
Share Holder
Share Holder

Posts : 3850
Join date : 2010-10-23
Age : 80
Location : West Ajijic
Humor : Sometimes

Back to top Go down

ROOF PAINTING TIME - Page 2 Empty Re: ROOF PAINTING TIME

Post by Sponsored content


Sponsored content


Back to top Go down

Page 2 of 2 Previous  1, 2

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum