Lake Chapala's INSIDE LAKESIDE
Log In or Register

Check your spam/junk folder for activation e-mail after you register.

Join the forum, it's quick and easy

Lake Chapala's INSIDE LAKESIDE
Log In or Register

Check your spam/junk folder for activation e-mail after you register.
Lake Chapala's INSIDE LAKESIDE
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Blockage and Expected Slow Downs at Pharr Brridge

2 posters

Go down

Blockage and Expected Slow Downs at Pharr Brridge Empty Blockage and Expected Slow Downs at Pharr Brridge

Post by BisbeeGal Tue Apr 12, 2022 6:54 am

I believe this affects only Truck Traffic.  

https://cdllife.com/2022/pharr-bridge-to-mexico-goes-unopened-monday-as-truckers-protest-new-increased-inspection/

The Pharr International Bridge did not open to traffic on Monday as truckers blocked access in protest of new cross-border inspection rules.

Drivers in Mexico blocked access to the bridge from Reynosa, Mexico into Texas on Monday, April 11th, prompting officers to close the southbound lanes from Texas into Reynosa. Although the bridge typically opens at 6 a.m. on Mondays, the protest forced traffic to come to a halt, and the bridge was not opened at all.

The drivers blocking to bridge are protesting Texas Governor Gregg Abbott’s announcement late last week notifying drivers that all commercial traffic entering Texas from Mexico will now be subject to “enhanced safety inspections of vehicles as they cross points of entry into Texas.” This new inspection will be conducted in addition to the typical federal inspection at the port of entry.

Increased wait times between 10 and 20 hours have already been felt by truckers entering the country, a fact which Governor Abbott admitted would be a result of the new inspections during a news conference.

“Now I know in advance this is going to dramatically slow traffic from Mexico into Texas,” he said at the conference.
BisbeeGal
BisbeeGal
Share Holder
Share Holder

Posts : 2397
Join date : 2020-03-14

Back to top Go down

Blockage and Expected Slow Downs at Pharr Brridge Empty Re: Blockage and Expected Slow Downs at Pharr Brridge

Post by Gamina Tue Apr 12, 2022 9:03 am

The Pharr bridge only processes cars from 6-8 in the morning and again late at night for a couple of hours.
Gamina
Gamina
Share Holder
Share Holder

Posts : 1037
Join date : 2011-05-05

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum